Today I produced a PowerPoint to share with our teachers. The PowerPoint shows our teachers what we have in our Outdoor Learning Center (OLC) Closet. These items are for them to use outside with their students. If we are having bad weather, the teachers can use the manipulatives in their classrooms. I also created the PowerPoint as a reminder for them to use the OLC as another source, or tool, in addition their classroom. Sometimes a new view will be just the ticket to producing more learning for a student.
Wednesday, October 26, 2011
Draft Action Research Report - Week 3 - EDLD5397
Draft Action Research Project Progress Report
- Title: Location, Installation, and Use of an Outdoor Learning Center
- Needs Assessment: Our campus had been looking forward to setting up some donated equipment for over a year. We had been in a transition phase in regard to principals, so the project was put off. Once we established who our new principal would be, the project was thrust upon her and she did not know what she wanted to do with the items. Since I needed an action research project, I asked her if I could help and she gladly gave me the job. Also, being the new principal, she wanted to focus on other more important aspects of being a new administrator, so my stepping in came as a welcomed relief for her. Our ESC donated this equipment, at first it was donated for our Head-Start students, but it turned out later that it was donated for all of our students. We did not have an Outdoor Learning Center (OLC) before this donation. Our campus wanted to have one to have other ways to help teach our students and open their quality of learning to new levels. When the project was given to me, I went to our Head-Start coordinator and we began working on ways to make this dream a reality. We got a committee together and we collaborated and planned with each other. The language explosure for our ELL students to outdoor lessons will be so beneficial. Many do not know the names of things they see outside in English, therefore, opening up this world to them will increase their vocabulary skills. The OLC is also a good place for our PPCD students to go and learn in a safe, secure environment.
- Objectives and Vision of the Action Research Project (ELCC 1.1): After the OLC was constructed and the two playground equipment toys placed into our playground, we discovered that one of the toys, the tricycle merry-go-round, was constantly breaking down. We would put out a work order for our maintenance men to fix it and soon after it would be broken again. Unfortunately, after talking with my site supervisor, we decided to remove that particular toy, for safety reasons. I believe removing that toy made our playground safer, thus making it an improvement. Our Head-Start teacher and I have been talking about making more improvements to the OLC. We would like to add an area for the students to have a butterfly cage, so that they can all see, for themselves, the life cycle of a butterfly. We have talked about getting a small bird cage, as well. We woud like to see more seating for our students and staff available in the OLC, to make it more comfortable for everyone to be able to sit. We want to expand the amount of manipulatives the students have for use in the OLC, and have other types of water games available for them. We want to get some painting easels and paint to use outside, also. All these things will help to make the OLC a more usable area and will open up more learning for all of our students.
- Review of the Literature and Action Research Strategy (ELCC 2.3): When I began looking at recent literature available for the construction and set up of an OLC, I used the internet. There were several sites that showed how very large OLC had been set up, but we did not have that much room or that much equipment to construct. We do want more things for our OLC, but we will have to be mindful of our space available. There were three people involved in our OLC committee, the Head-Start Coordinator, One member of the Campus Improvement Committee, and me. We took into consideration all of our students; our special PPCD students and our wheel chair students. Our set-up took into consideration our maintenance staff and their job of cutting the grass and maintaining the building. We contacted them to mark our area for waterlines, phone lines, or gas lines. They did not come out to do that, but fortunately our construction crew only ran into one pipe and they caught themselves before that caused any damage. Our committee made decision in regard to placement of the equipment, contacting local stores for donations, contacting volunteers to be on the construction crew, and decisions about where to store the equipment before the set-up crew arrived. I contacted our maintenance staff to get us the boards and water sealant, and various other tools we would need for the day of constrction.
- Articulate the Vision (ELCC 1.2): Our principal communicated the vision for our OLC to our faculty and staff and then when we formed our committee and needed help from the community we communicated the vision for the OLC as a learning tool for all students. We indicated to them that the learning center would open up more academic language for the students and would be a good place for them to open up their minds to what they can do and learn outside of the classroom.
- Manage the Organization (ELCC 3.1): Student safety was our highest priority. In the design of the center we considered how the students would be facing to be most attentive to lessons. I looked up lessons on the internet and printed them out so that our teachers would have more lessons to use. Teachers themselves have lessons that they use when they go out there, as well. Staff from our ESC came to help us construct the equipment. Our committee was in charge of finding a location to store the equipment, so we used a vacant room in our building that was close to the area where we were planning to set-up the center. We did not have to deal with any money because we contacted local companies to donate items that we needed. We utilized our teaching staff to donate food items to feed our volunteers, so we really did not have to pay for anything. Time and weather were our friends because we contacted our ESC and our volunteers and we decided on a good day for everyone to come and set up the center.
- Manage Operations (ELCC 3.2): When my principal gave me the project, I contacted my two other committee members and we went to work immediately. Our Head-Start coordinator contacted our local companies for donations and she and I together contacted volunteers. The three of us set the date for the construction of the OLC, after talking with a few volunteers, our ESC, and the weather channel. Our Improvement Committee team member contacted our teachers for the food donations and when those items should be delivered. Each time we met we would collaborate and make sure to were in agreement on what to do and who needed to do the different assignments. Any conflicts we had were resolved through talking or one of us would handle the situation by going and get it done ourselves.
- Respond to Community Interest and Needs (ELCC 4.2): I believe our PPCD students and wheel chair students will be able to get outside in a protected environment and feel, touch, smell, see, and taste things that cannot be done in a classroom setting. Language development in an outdoor setting can be of utmost importance, because our PPCD and ELL students will benefit from the things they will see, feel, touch, smell, and taste. Being out in the sun is physically beneficial, as well. Our school and community can benefit from the OLC because our parents, community businesses, and school personnel can help with things we need for the center when they have a specific project they are doing. Our community is always so helpful when it comes to helping our students improve their learning.
Tuesday, October 18, 2011
Update on Outdoor Learning Center Action Research Project
It has been a long while since I have updated my research project. I guess we sort of all dropped the ball on that. Either way though, at the beginning of this school year, I did make out the new Outdoor Learning Center (OLC) Sign-Up Schedule for our teachers. I used a notebook and placed sign-up sheets in it for the entire year. I made sure to make note of days when we would not be in school so that teachers would not sign up for those days.
When the OLC was donated to us, they also donated two items/toys that went out into our playground for all the students to use. One of the toys has been in constant repair since we placed it out there. It is a bicycle merry-go-round and the kids love it so much that they wear it out. Our maintenance department is having trouble keeping up with the repairs on that specific toy. I believe my principal would rather the toy be removed rather than have to bother our maintenance department all the time. It is a really neat toy though, so I hope they can figure out a way to make a permanent fix, so that the toy will be allowed to stay. I plan on talking with my principal about that this week. I will get back with you all on the outcome of that conversation.
The OLC, on the other hand, is doing very well! I am excited about that because, even though at the beginning of the year it was too hot to be outdoors, some of our teachers still would go out and use the center for a few minutes. Now that it is getting cooler around here, today our high was 70, I believe the teachers will use it more often. There has even been talk that we may be adding a few more items to the OLC to make it more appealing. I do not know if I will be in charge of the second phase of the OLC, but I will definitely avail myself to be part of the committee.
When the OLC was donated to us, they also donated two items/toys that went out into our playground for all the students to use. One of the toys has been in constant repair since we placed it out there. It is a bicycle merry-go-round and the kids love it so much that they wear it out. Our maintenance department is having trouble keeping up with the repairs on that specific toy. I believe my principal would rather the toy be removed rather than have to bother our maintenance department all the time. It is a really neat toy though, so I hope they can figure out a way to make a permanent fix, so that the toy will be allowed to stay. I plan on talking with my principal about that this week. I will get back with you all on the outcome of that conversation.
The OLC, on the other hand, is doing very well! I am excited about that because, even though at the beginning of the year it was too hot to be outdoors, some of our teachers still would go out and use the center for a few minutes. Now that it is getting cooler around here, today our high was 70, I believe the teachers will use it more often. There has even been talk that we may be adding a few more items to the OLC to make it more appealing. I do not know if I will be in charge of the second phase of the OLC, but I will definitely avail myself to be part of the committee.
Tuesday, April 19, 2011
4/19/11 Update on ARP
I had a chance to speak with my Site Supervisor today regarding the lesson plans and the outdoor classroom schedule. She approved the lesson plans and also approved for me to open up the idea to all our teachers to contribute a lesson plan for the outdoor learning classroom. I am excited about that aspect, because I am a firm believer in "two heads are better than one" and I know that our teachers will come up with some really good lessons to contribute.
We also talked about getting a water hose out into that area to be able to water our plants and to have water lessons out there. I am going to speak with our school secretary tomorrow to ask her to send a work order to our maintenance department to do just that. Hopefully they will be able to do this for us. Our Head Start teacher and her paraprofessional have been going out there and watering the flowers that they planted, but they are having to make several trips in and out of the building to a nearby classroom to get water to the flowers. I am looking forward to seeing if maintenance will be able to get us hooked up with a hose and a turning wheel to roll it up on.
I look forward to hearing your comments, please give me some comments. Thank you...8)
We also talked about getting a water hose out into that area to be able to water our plants and to have water lessons out there. I am going to speak with our school secretary tomorrow to ask her to send a work order to our maintenance department to do just that. Hopefully they will be able to do this for us. Our Head Start teacher and her paraprofessional have been going out there and watering the flowers that they planted, but they are having to make several trips in and out of the building to a nearby classroom to get water to the flowers. I am looking forward to seeing if maintenance will be able to get us hooked up with a hose and a turning wheel to roll it up on.
I look forward to hearing your comments, please give me some comments. Thank you...8)
Monday, April 18, 2011
4/18/11 Update on ARP
My project is the playground/outdoor classroom project. I turned in some outdoor classroom lesson plans and a tentative schedule for teacher's use of the outdoor classroom last week to my principal. She has been quite busy with ARD's, TPRI, and other end of year committments that she has not had a chance to look at the information I have submitted. I will wait patiently for her to get to it and let me know though, because I know how end of year committments can be overwhelming and time constrainting.
I am thinking about opening up the "contribution of lesson plans" to our campus teachers and see if they would like to think up a lesson that they would like to do in the outdoor classroom and contriubte that lesson to our "file" of outdoor classroom lesson plans. What do you all think? Would that be a good idea and do you think I would get a good response? Our teachers are always so creative, that I just thought it would be a sweet idea for them to share their ideas for our whole campus to be able to use at their leisure. Let me know what you all think.
Okay, until next time...have a great week! This weeks School Law lectures are very interesting!
I am thinking about opening up the "contribution of lesson plans" to our campus teachers and see if they would like to think up a lesson that they would like to do in the outdoor classroom and contriubte that lesson to our "file" of outdoor classroom lesson plans. What do you all think? Would that be a good idea and do you think I would get a good response? Our teachers are always so creative, that I just thought it would be a sweet idea for them to share their ideas for our whole campus to be able to use at their leisure. Let me know what you all think.
Okay, until next time...have a great week! This weeks School Law lectures are very interesting!
Wednesday, April 13, 2011
Update on Playground and Outdoor Classroom
Since March 26th, the kids have been so excited to use the playground equipment. Our Head Start class was the first to use our Outdoor Classroom and they placed flowers into our flowerbeds. The flowers and soil were donated by Lowes and Walmart. A week ago though, one of the playground equipment toys, the bicycle track, started losing it's bolts, the kids have been lined up to play on it each day since it was put in, so I guess it was getting worn out! We called our ESC, because they helped us put it in, and they came over and fixed it for us.
I have been working on a time schedule for teachers to use the Outdoor Classroom and on Lesson Plans to get them started. I turned them in to my Site Supervisor today and she is supposed to be looking over all of the information and letting me know what we may need to change. I will keep you all posted.
Have a blessed week!! The web link to the article about our Head Start Class is also attached, check it out...the kids had a lot of fun with their parents and teachers helping them put in the flowers.
http://www.lindaleeagles.org/newsletter.php?id=233
I have been working on a time schedule for teachers to use the Outdoor Classroom and on Lesson Plans to get them started. I turned them in to my Site Supervisor today and she is supposed to be looking over all of the information and letting me know what we may need to change. I will keep you all posted.
Have a blessed week!! The web link to the article about our Head Start Class is also attached, check it out...the kids had a lot of fun with their parents and teachers helping them put in the flowers.
http://www.lindaleeagles.org/newsletter.php?id=233
Saturday, March 26, 2011
Installation of Playground Equipment and Outdoor Classroom...A Success!!!
Hello Instructors and fellow classmates,
First, let me start by saying, we had a very beautiful day, weather wise, for setting up the playground equipment and the outdoor classroom! Thank you Lord!
We had about 16 people (including men and women) show up to help with the construction and serving. Karen, her husband, and I showed up first to get the coffee and donuts set out for the volunteers to have some breakfast before starting the project. Right after that we all broke up into teams and went to work. Karen and I, (mostly Karen) had been working with Lowes to donate some items to build some flower-beds. They were supposed to have everything ready yesterday, but something came up, so Karen and I drove over and picked up the items this morning and the men were able to construct the flower-beds before 2:00 o'clock. We send out a HUGE, THANK YOU, to LOWES and your wonderful team here in Lindale, Texas!!! GRACIAS!!! 100 x's. :)
Earlier in the week, I had sent out an email to all our ECC staff requesting food and drink donations for our volunteers and told everyone that I had posted a list of the items we wanted in our workroom. I am proud and thankful to report that we had a great response! I work with the best teachers and staff in the world! They allowed themselves to be a blessing to our volunteers and to me. There was a lot of food!! We even had enough left over to share with our teachers and staff on Monday. So a nice shout out to our ECC faculty and staff!! Hoorah!!!
When I first started this project, I contacted our maintenance department to find out where they had put the equipment that had come in over the summer and to see if they could bring it over to our building so that it would be there when we needed to install them. Our district had been responsible to purchase a few things in order to help construct the outdoor classroom, so I inquired from maintenance to see if the items had been purchased, they had been. They also went out and purchased some water sealant, liquid nail and caulking gun, and some brushes for us to be able to use as well. There were a few things that our maintenance crew was supposed to do, but forgot. One was to drop off the cement we were going to need to brace the balance bar and balance logs into place, but they forgot to bring the cement, so while we were at Lowes, we bought a few bags. Maintenance was also supposed to come and flag the area so we would know where any underground lines were located, we wrote and sent out the workorder three weeks in advance. They did not do that, thank God one of our volunteers only ran into one gas line, bus stopped just short of piercing the line. That was the only problem we had with underground lines or pipes. They were also supposed to bring these long nails to brace our climbing rock, we do not know what happened to them, but one of the gentlemen from our ESC said he had some and he would come and put them in on Monday. So, we had a few setbacks, but nothing that we could not overcome. So, we send a shout out to our Maintenance Crew for all their help, as well!! Hoorah!!
I could not have gotten all this organized and done without the fantastic help of Karen Rehders, Kristy Watson and especially my Site Supervisor, Dana Sustaire. I send you three out a Super Great Shout Out...HOORAH!!! I also want to give an ENORMOUS THANK YOU to all our community Volunteers and our ESC volunteers, John and Bob, you're the best...THANK YOU & GRACIAS 100 X'S! There is on more entity I want to send a GINORMOUS THANK YOU to and that is our ESC Head Start Program, for their donation of the playground equipment and the outdoor classroom...THANK YOU & GRACIAS 1000 X'S. I hope I did not leave anyone out.
When it was finshed, we stood back and looked at it, took lots of pictures, and felt a sense of pride and a sense of relief, that this part of the project was just about finished. We still need to get some dirt, fall zone material, and a few little odd and ends done before it will be completely ready, but for the majority, it is done! We had everything done and cleaned up, even the food and table put away, by 2:30, thanks to everyone's help and cooperation. It was a beautiful day and we had fun doing the work.
First, let me start by saying, we had a very beautiful day, weather wise, for setting up the playground equipment and the outdoor classroom! Thank you Lord!
We had about 16 people (including men and women) show up to help with the construction and serving. Karen, her husband, and I showed up first to get the coffee and donuts set out for the volunteers to have some breakfast before starting the project. Right after that we all broke up into teams and went to work. Karen and I, (mostly Karen) had been working with Lowes to donate some items to build some flower-beds. They were supposed to have everything ready yesterday, but something came up, so Karen and I drove over and picked up the items this morning and the men were able to construct the flower-beds before 2:00 o'clock. We send out a HUGE, THANK YOU, to LOWES and your wonderful team here in Lindale, Texas!!! GRACIAS!!! 100 x's. :)
Earlier in the week, I had sent out an email to all our ECC staff requesting food and drink donations for our volunteers and told everyone that I had posted a list of the items we wanted in our workroom. I am proud and thankful to report that we had a great response! I work with the best teachers and staff in the world! They allowed themselves to be a blessing to our volunteers and to me. There was a lot of food!! We even had enough left over to share with our teachers and staff on Monday. So a nice shout out to our ECC faculty and staff!! Hoorah!!!
When I first started this project, I contacted our maintenance department to find out where they had put the equipment that had come in over the summer and to see if they could bring it over to our building so that it would be there when we needed to install them. Our district had been responsible to purchase a few things in order to help construct the outdoor classroom, so I inquired from maintenance to see if the items had been purchased, they had been. They also went out and purchased some water sealant, liquid nail and caulking gun, and some brushes for us to be able to use as well. There were a few things that our maintenance crew was supposed to do, but forgot. One was to drop off the cement we were going to need to brace the balance bar and balance logs into place, but they forgot to bring the cement, so while we were at Lowes, we bought a few bags. Maintenance was also supposed to come and flag the area so we would know where any underground lines were located, we wrote and sent out the workorder three weeks in advance. They did not do that, thank God one of our volunteers only ran into one gas line, bus stopped just short of piercing the line. That was the only problem we had with underground lines or pipes. They were also supposed to bring these long nails to brace our climbing rock, we do not know what happened to them, but one of the gentlemen from our ESC said he had some and he would come and put them in on Monday. So, we had a few setbacks, but nothing that we could not overcome. So, we send a shout out to our Maintenance Crew for all their help, as well!! Hoorah!!
I could not have gotten all this organized and done without the fantastic help of Karen Rehders, Kristy Watson and especially my Site Supervisor, Dana Sustaire. I send you three out a Super Great Shout Out...HOORAH!!! I also want to give an ENORMOUS THANK YOU to all our community Volunteers and our ESC volunteers, John and Bob, you're the best...THANK YOU & GRACIAS 100 X'S! There is on more entity I want to send a GINORMOUS THANK YOU to and that is our ESC Head Start Program, for their donation of the playground equipment and the outdoor classroom...THANK YOU & GRACIAS 1000 X'S. I hope I did not leave anyone out.
When it was finshed, we stood back and looked at it, took lots of pictures, and felt a sense of pride and a sense of relief, that this part of the project was just about finished. We still need to get some dirt, fall zone material, and a few little odd and ends done before it will be completely ready, but for the majority, it is done! We had everything done and cleaned up, even the food and table put away, by 2:30, thanks to everyone's help and cooperation. It was a beautiful day and we had fun doing the work.
Friday, March 25, 2011
Week 5 - Final Reflections
As I look back on my first week day in this course, I cannot help but remember thinking this was not going to be a very fun class. Why? Well, my first thought about anything related to the word research “come from the process-product paradigm and include a ‘controlled setting,’ ‘an experiment with controls and treatment groups,’ ‘an objective scientist removed from the subjects of study so as not to contaminate findings,’ ‘long hours in the library,’ and ‘crunching numbers.’” (Dana, 2009) I was not too happy about that. To my surprise, the research, better termed “inquiry or wondering,” turned out to be the opposite of my original thought. It was a wonderful surprise to learn that I was going to be the “head learner” and the chooser of my “inquiry.” I was going to be able to choose something that was going to make a difference in my school and in my district! I became excited about that and the class took on a whole different tone.
I enjoyed the videos from the three different former Lamar students and learned that while doing my research, I should look into the research that others have done and not feel like I have to reinvent the wheel. I also learned that I should choose action research that is practical for my learning and the benefit of my school and my students not research that is theoretical. Not that theory is bad, but in seeking action research that is practical, you learn more because it interests you more.
The various formats for writing out our action research were very beneficial as well. Once you’ve gone through each of the steps and have written down your “well” though-out plan, with timelines and everything, it gives you pause and a sense of accomplishment as well as relief to see it in black and white. Then you go and post it on your blog and your peers and instructors help you by giving you constructive criticism on what you’ve written. You reflect on their thoughts and you make adjustments as necessary. This form of research is so much better than the traditional research. You feel like you’re making it your own and when it is finished, you will feel a sense of pride because you’ve actually impacted the lives of students, colleagues, and yourself.
I enjoyed learning about the three strategies for sustaining improvement from the Harris, et al book. For my project, regarding the playground/outdoor classroom, the Force Field Analysis worked best. Although, I am eager to try out the other two, the Delphi Method and the Nominal Group Technique at a later date. Making use of the CARE Model also helped me to look into ideas that may need change in the future and ideas for use of the Delphi and Nominal strategies.
All in all, I have enjoyed this class because it turned out totally different than what I expected it would, pleasantly so. This class has opened my eyes to a whole new way of exploring research and it will benefit me as a future administrator and leader. I have a whole new respect for research and for collaboration in research. Talking with my Site Supervisor has helped me so very much in designing my action research plan. She has a wealth of knowledge that I am benefiting from. Each person that has commented on my blog or in the Discussion Board to something I have posted, I have taken your insights and I have reflected on them. After reflecting on them, I have added your insight to my plan or have tweaked my plan in some way because of your comments, so thank you for your comments. You are all so helpful! References:
Dana, N. F. (2009). Leading with passion and knowledge: The principal as action researcher.
Thousand Oaks, CA: Corwin Press.
Harris, S., Edmonson, S., & Combs, J. (2010). Examining what we do to improve our schools:
8 steps from analysis to action. Larchmont, NY: Eye On Education.
Friday, March 18, 2011
Agreed Upon Action Research Plan
After speaking with my Site Supervisor, there has been no change to the previously posted AR plan. Her main concern is that the outdoor classroom be continually used and not go to waste. With the development and addition of lesson plans for teachers to immediately use, this should not be a problem. Teachers are certainly welcome to come up with their own lesson plan to use with the outdoor classroom, but I will also include several lesson plans to help get them started and to sponsor and support the use of the outdoor classroom.
Monday, March 14, 2011
Developing the Action Research Plan
Deb Kellas - EDLD5301 - EA1267 - Week 3 - Developing the Action Research Plan
· Design a usable, safe playground/outdoor classroom. · Create a few usable lesson plans for the outdoor classroom to get teachers started. · Field observation to experience the hands-on learning accomplished by our students. |
· Solicit the help of ESC Head Start Staff, Head Start Dads, Eagel DADS, and Site base committee Dads, if necessary, to help in the construction and design of the playground/outdoor classroom. · Solicit the donation of food, drinks, and serving assistance to feed our construction crew. · Gather all the equipment and tools needed for the day of assembly. · Constant collaboration with site supervisor and playground/outdoor classroom committee. |
· I will use the Internet as a resource. · I will use literature on playground and outdoor classrooms as a resource. · I will use suggestions from people in this line of work or who have done this before. · I will use suggestions from my fellow students on the web-blog. · Collaboration with site supervisor and playground/outdoor classroom committee input. · Teacher Surveys · Field observations as the teachers take out their students to use the outdoor classroom. · Digital Camera |
· February 23: set up appointment with Maintenance to see where all the equipment is being stored. · March 2: get all the equipment placed in one designated area. · March 3: have ESC Staff come over to ECC to make sure we have all donated equipment necessary to begin construction · March 3-25: Identify design or layout in collaboration with playground/outdoor classroom committee. Identify/Create a few lesson plans for teachers to use. · March 26: All construction and catering help will gather at 8:00 a.m. and begin construction of the playground/outdoor classroom. · March 28-April 8: Give maintenance crew time to put the Thompson Sealant on the equipment and allow drying. · April 11-May 27: Gather data regarding use of the outdoor classroom using Teacher Surveys, Field Observations, Interviews with teachers and students, and Pictures. · June-July: Write the Action Research Paper |
· Myself · Site Supervisor · Karen Rehders, Roxie Miles · ESC Head Start Construction Staff (John Hurst and Bob ?) · Head Start Dads, Eagle DADS, Committee Members Husbands · Site Base Committee Members · Lindale ISD Maintenance Crew · Teachers being surveyed |
· Teacher Surveys and Interviews · Continuous Field Observation · Site Supervisor Interview for insight/input once it is complete. · Development of more Outdoor Classroom Lesson Plans in collaboration with the Teachers and Site Base Committee for continued use. |
· Surveys, Interviews, Observations · Construction crew and Committee will play on the equipment to assess that it is sturdy and ready for use by Teachers and Students. |
Friday, March 11, 2011
Lessons Learned In Week 3
Is that we need to the leaders of our own learning. As future leaders, we need to embrace the idea of doing research on our "wonderings." It will be nice, though, when we can get a team of professionals to help us out though. That is the reason I like this idea of blogging because I look forward to see your responses and ideas regarding our action research plans. The Dana book states that we need to have a "welcoming attitude toward and active seeking of change: "Essentially research is nothing but a state of mind...a friendly, welcoming attitude toward change,...going out to look for change instead of waiting for it to come" (Kettering, in Boyd, 1961). I know that if I look around my campus I could find some real situations that need attention and change. It's a matter of finding caring enough individuals to take on the challenges to make the necessary changes. We read this week and last week that an administrators day is quite full and finding time to do inquiries/wonderings is hard but essential. So, as students and aspiring leaders, it is most likely a load off of your administrators mind that you and I are taking on a wondering for them. It helps us and it helps them, as well. It helps the school culture and climate, because the administrator has one less wondering to worry about.
Wednesday, March 9, 2011
AR Plan Process Overview
ACTION RESEARCH PLAN
PROCESS OVERVIEW
1. Setting the Foundation: Through a discussion with our Site Base Committee it was asked what we were planning to do with the playground equipment that was donated to our campus. Our campus principal brought it up again during one of our Lead Teacher Meeting. During the time my site supervisor and I were reviewing my Internship Plan, this question was posed again, so my site supervisor asked me to oversee the project of getting that equipment setup and useful for our campus.
2. Analyzing Date: Seeing as we will be working directly on our campus to set up this playground/outdoor classroom equipment, I will utilize the Internet, literature, interviews with ESC staff that have set up this type of equipment before, site supervisor input, and Site Base Committee input to analyze the data.
3. Developing Deeper Understanding: As I have used the internet to investigate outdoor classrooms and playgrounds, I have come up with several more questions that need to be asked before setting up the equipment. How many children will the playground serve at one time? Are there children with special needs to consider? Where will we set up the sign-up sheet so the teachers can take turns using the outdoor classroom? Where is the best sunlight for our vegetation box or plant box? Do we need to remove anything from the site? Do we need to level? Who will furnish the “Thompson Water Sealant” to seal the wood, so that the equipment will last for a very long time and so it will not splinter and cause a child to get hurt? And many more questions that surely will come up as we continue the project.
4. Engage In Self-Reflection: I will use self-reflection during this project because I really want this playground to be used for special projects in which children can become engaged. We used to have a “Water Playground” that was not useful and so it was taken down. I do not want that to happen to this playground. So, as the students and teachers use the outdoor classroom, I would like to take pictures, view the lesson plan, and display the children’s work to show that the outdoor classroom is being used. This will also show our community that the outdoor classroom is being used and is not a waste. Reflection will be a useful tool once the outdoor classroom is in use.
5. Exploring Programmatic Patterns: During the time that I am working on this project, I will be in constant communication with my site supervisor, Our Head Start Staff, and our Site Base Committee, so that everything that is done will be done for a useful purpose and with our desired goal in mind. We want this outdoor classroom to be useful for students and teachers. . I would maybe survey the teachers and ask them what else they would need to help them make good use of the outdoor classroom.
6. Determining Direction: In determining my direction, I will definitely need to stay in contact with my site supervisor and our maintenance crew because we want to make sure our outdoor classroom is set up in a way in which it will be useful for students and teachers, but also easy to maintain for our maintenance crew. I will be in constant collaboration with all the people involved in this project so that we are going in the right direction. When I first thought about doing this project, I thought it could be done quickly and I could go on to another project, but as I look at all the goals and desires for the success of this project, I see that it will take longer than I anticipated. I will have to re-vamp my timeline to reflect a different projected date.
7. Taking Action For School Improvement: I have contacted our ESC Staff and one gentleman has come out to make sure we have all the equipment that was donated. He also showed me pictures from several other campuses he and his co-worker have set up together with community helpers. My site supervisor, Head Start Staff, and Site Base Committee members will be informed constantly regarding the plans of this playground/outdoor classroom. Together we will collaborate to make sure everything is going as planned and we will monitor it’s use so as to address any issues that may arise.
8. Sustain Improvement: I will also be monitoring the use of the outdoor classroom and surveying the teachers to see what else we may need to do to help improve and sustain the use of the outdoor classroom. I will share outcomes with my campus, our district and our community. I will also share the results with my online blog colleagues.
Action Reseach Plan
I will begin by asking the question: “What is the best way to design/layout the playground/outdoor classroom so that it will be safe and useful for both students and teachers?
The project will be done on my campus, Early Childhood Campus. It will take up the back portion of our existing playground and will be fenced off for designated use. It will also be fenced off so that students will not get into the area during regular recess time. My target population will be that of students (ages 4-7) and teachers. They will be the ones using the outdoor classroom for outdoor projects chosen by the teachers.
I will do online and literature research along with taking suggestions from ESC staff that have done this sort of setup before, to investigate different ways to best set up the playground/outdoor classroom equipment. I need to take into consideration:
Ø Does our site have any space constraints or unique features?
Ø Will we need to do any preparation to the site?
o Tree removal
o Leveling
o Drainage problems
o Flagging of underground pipes or wires
Ø Where is the best sunlight for our vegetation boxes to be set?
Ø The ages of the children will be between 4-6 years of age.
Ø The safety of these small children is uppermost in my mind. So I will be checking the equipment for any flaws and asking maintenance to put “Thompson Water Sealant” on the equipment so it does not splinter.
Ø How many children will be on the playground at one time?
Ø Are there children with special needs that we need to consider?
Ø What is the specific design or look we want to achieve?
Ø Are there many lesson plans out there for the continued use of this playground/outdoor classroom?
Ø What other types of activities do we want to incorporate into our outdoor classroom?
Ø Who will help us install the equipment? How will we make sure the equipment is preserved so it lasts for many years to come?
Ø Will our Site Base Committee want to help with the construction or with feeding those people who are helping with the construction/installation?
Ø Do we need any more pieces or equipment to make the playground/outdoor classroom better? What kind of manipulates will we need for our students and teachers to use in their projects?
There questions and possibly more questions that develop as we move along, will be collaboratively answered by Karen Rehders, Head Start Coordinator, Roxie Miles, Head Start Teacher, ESC Staff, Site Base Committee, my Principal, our Maintenance Staff, our Superintendent (if necessary), and myself. I want this playground/outdoor classroom to be as productive as possible and not just sit out there not being used. I would like to create or find already created lesson plans for our teachers to choose from and to incorporate into their curriculum.
Sunday, March 6, 2011
Nine Passions That Drive Wonderings
This week we read and wrote about nine different, yet related, passions for us to be able to chose our first wondering, they are: Staff Development, Curriculum Development, Individual Teacher(s), Individual Student(s), School Culture/Community, Leadership, Management, School Performance, and Social Justice.
As I read these, I came across a few that are related to a topic that I have been thinking about doing an action research project on. When I did my Leadership Book Review, I read "Results Now" by Mike Schmoker, and he stated in the book that we have too many TEKS and that they need to be more concise. He suggests we should, as a grade level, go through the TEKS and choose the ones that are most important to making sure the students can pass the state assessment (TPRI) and progress to the next grade level. He suggests we then decide, as a grade level, best instructional strategies and common assessments to evaluate how the students are progressing each six weeks. I am interested in doing my action research project, as a grade level, on condensing the TEKS and creating common assessments that will help evaluate our instructional startegies, so that our students can be successful on TPRI and be ready for first grade.
As I read these, I came across a few that are related to a topic that I have been thinking about doing an action research project on. When I did my Leadership Book Review, I read "Results Now" by Mike Schmoker, and he stated in the book that we have too many TEKS and that they need to be more concise. He suggests we should, as a grade level, go through the TEKS and choose the ones that are most important to making sure the students can pass the state assessment (TPRI) and progress to the next grade level. He suggests we then decide, as a grade level, best instructional strategies and common assessments to evaluate how the students are progressing each six weeks. I am interested in doing my action research project, as a grade level, on condensing the TEKS and creating common assessments that will help evaluate our instructional startegies, so that our students can be successful on TPRI and be ready for first grade.
Purpose and Significance of my Action Research
Purpose and Significance of Action Research:
While discussing my internship plan with my site supervisor, she mentioned having been donated some playground equipment that she did not want to lose. It was being donated to us from Head Start and she wanted to make good use of it, but did not know exactly what to do with it. We decided it would be a good research project for me. Our Head Start teacher, coordinator and I, along with our ESC Head Start personnel, have been brainstorming ideas for how to design this playground/outdoor classroom.
The purpose for the playground/outdoor classroom is to provide our students and teachers with a playground that can also be used as a classroom. The area can be used for hands-on learning in both real play and academic cross-curricular activities.
The significance of the research will reflect that students will benefit from this area as a playground and as a classroom. They will develop socially, physically, emotionally, and academically. Teachers will benefit from the area as they develop lessons that will allow them to use the area as an educational tool. Our community will benefit from the area as they see how their children are benefiting from the playground/outdoor classroom that a few of them will have helped us construct.
While discussing my internship plan with my site supervisor, she mentioned having been donated some playground equipment that she did not want to lose. It was being donated to us from Head Start and she wanted to make good use of it, but did not know exactly what to do with it. We decided it would be a good research project for me. Our Head Start teacher, coordinator and I, along with our ESC Head Start personnel, have been brainstorming ideas for how to design this playground/outdoor classroom.
The purpose for the playground/outdoor classroom is to provide our students and teachers with a playground that can also be used as a classroom. The area can be used for hands-on learning in both real play and academic cross-curricular activities.
The significance of the research will reflect that students will benefit from this area as a playground and as a classroom. They will develop socially, physically, emotionally, and academically. Teachers will benefit from the area as they develop lessons that will allow them to use the area as an educational tool. Our community will benefit from the area as they see how their children are benefiting from the playground/outdoor classroom that a few of them will have helped us construct.
Wednesday, February 23, 2011
What I Have Learned About Action Research
What I have learned about action research is that it is a way for administrators and teachers to be involved in the everyday investigative research regarding problems that come up in our schools. We do not have to wait on university researchers to come up with solutions to our everyday problems...we collaboratively come up with the solutions ourselves. Through the use of the four contexts for facilitating the development of action research, we can get many things accomplished. Principals and aspiring principals enroll in local colleges or universities and can then use their course work as a springboard to do action research projects that help them answer questions that they may be facing. Sup erintendent and/or district meetings can be set up to where the focus is for the principals to help each other identify areas for action research and then share amongst themselves the results. Leadership teams, that are put together by the principal using classroom teachers, can become active in collaboratively helping the principal make decisions for the questions that come up on their campuses and finally, professional learning communities can be used by the principal as well to take on some instructional, assessment, and behavioral issues that come up on a daily basis. It is a matter of working together to find solutions, so that the burden is not left to one "lone-inquirer." (p19)
How can I use action research? I can use action research to answer this question having to do with our playground equipment. Together with our Safetly and Climate Control Committee, we can tackle this question and come to a consensus that will benefit the school as a whole. I am sure that throughtout our time as students, more questions will arise that we can tackle and because we now know about the use of "action research" we will not be as afraid to step out and take the challenge of researching out a problem. We know we can form committee's and work collaboratively with our colleagues and with each other to find solutions. Then we can celebrate our results with each other!!
How Might Educational Leaders Use Blogs?
Educational leaders might use blogs to gain insight from other colleagues as to how to answer a question that may have arose on their campus. Chances are that similar situations occur on different campuses and someone may have already dealt with an issue that you may be going through and can share their insight. Educational leaders could brainstorm with each other about ideas to face different challenges faced in their work day. Then again, Educational leaders may just want to talk with someone of like mind, as friends that understand each others frame of mind, to just talk about good things that have happened in their day. It seems to me that blogging would not always have to be used for business, but could be used for relaxation, a way to sit and capture, through writing, ones thoughts for the day.
Not like that teacher that was on Good Morning America that was bashing her students, but as a source of written release of thoughts that would be understood by people of like mindedness.
How can I use action research? I can use action research to answer this question having to do with our playground equipment. Together with our Safetly and Climate Control Committee, we can tackle this question and come to a consensus that will benefit the school as a whole. I am sure that throughtout our time as students, more questions will arise that we can tackle and because we now know about the use of "action research" we will not be as afraid to step out and take the challenge of researching out a problem. We know we can form committee's and work collaboratively with our colleagues and with each other to find solutions. Then we can celebrate our results with each other!!
How Might Educational Leaders Use Blogs?
Educational leaders might use blogs to gain insight from other colleagues as to how to answer a question that may have arose on their campus. Chances are that similar situations occur on different campuses and someone may have already dealt with an issue that you may be going through and can share their insight. Educational leaders could brainstorm with each other about ideas to face different challenges faced in their work day. Then again, Educational leaders may just want to talk with someone of like mind, as friends that understand each others frame of mind, to just talk about good things that have happened in their day. It seems to me that blogging would not always have to be used for business, but could be used for relaxation, a way to sit and capture, through writing, ones thoughts for the day.
Not like that teacher that was on Good Morning America that was bashing her students, but as a source of written release of thoughts that would be understood by people of like mindedness.
Action Research Project - Problem & Question
Action Research Project Problem:
The problem we have is that we have been given some playground equipment that we do not want to send back. Our other problem is that, our campus has been through some construction and so now we have various types of lines and pipes running under the ground to where we cannot dig too far down to secure the playground equipment. We are going to have to research were these lines and pipes are in our small playground and find a good area to safely and securely place the equipment for our students to use it.
Action Research Project Question:
How can we design/layout our playground so that the playground equipment is safely and securely in place to where our students can play on it without getting hurt due to faulty installation?
The problem we have is that we have been given some playground equipment that we do not want to send back. Our other problem is that, our campus has been through some construction and so now we have various types of lines and pipes running under the ground to where we cannot dig too far down to secure the playground equipment. We are going to have to research were these lines and pipes are in our small playground and find a good area to safely and securely place the equipment for our students to use it.
Action Research Project Question:
How can we design/layout our playground so that the playground equipment is safely and securely in place to where our students can play on it without getting hurt due to faulty installation?
Tuesday, February 22, 2011
Deb's Action Question
My "Action Question" is: What is the best and safest way to design/layout our new playground equipment to best suit the way our students will use it, learn from it, and play with it?